Title: Developing a fuzzy risk assessment model for guaranteed maximum price and target cost contracts in construction
Authors: Chan, Joseph H. L.
Chan, Daniel W. M.
Chan, Albert P. C.
Lam, Tsun-ip Patrick
Yeung, Fai-yip
Subjects: Construction industry
Contracts
Hong Kong
Risk assessment
Target costs
Issue Date: Feb-2011
Publisher: Emerald Group Publishing Limited
Citation: Journal of facilities management, 2011, v. 9 no. 1, p. 34-51
Abstract: Purpose – The purpose of this paper is to develop a fuzzy risk assessment model for construction projects procured with target cost contracts (TCC) and guaranteed maximum price (GMP) contracts using factor analysis (FA) and fuzzy synthetic evaluation method, based on an empirical questionnaire survey with relevant industrial practitioners in Hong Kong.
Design/methodology/approach – A total of 34 key risk factors (RFs) inherent with TCC/GMP contracts were identified through an extensive literature review and a series of structured interviews. A questionnaire survey was then launched to solicit the opinions of industrial practitioners on risk assessment of such RFs.
Findings – The most important 17 principal RFs after the calculation of normalised values were selected for undertaking FA. Five principal risk groups (PRGs) were then generated in descending order of importance as: design risks, pre-contract risks, economic and financial risks, lack of experience in TCC/GMP procurement process and post-contract risks. These survey findings also reveal that design risks may be the major hurdle to the success of TCC/GMP projects in Hong Kong.
Originality/value – An overall risk index (ORI) associated with TCC/GMP construction projects and the risk indices of individual PRGs can be generated from the model for reference. An objective and reliable assessment can be achieved. The model provides a solid platform to measure, evaluate and reduce the risk levels of TCC/GMP projects based on objective evidence instead of subjective judgments. The research methodology could be replicated in other countries or regions to produce similar models for international comparisons and the assessment of risk levels for different types of TCC/GMP projects worldwide.
Description: DOI: 10.1108/14725961111105709
Rights: Journal of Facilities Management © 2011 Emerald Group Publishing Limited
Type: Journal/Magazine Article
URI: http://hdl.handle.net/10397/3668
ISSN: 1472-5967
Appears in Collections:BRE Journal/Magazine Articles

Files in This Item:

File Description SizeFormat
PolyU IR Submission 2011_JFM_1.pdfPre-published version181.54 kBAdobe PDFView/Open
Locate publisher version via PolyU eLinks



Facebook Facebook del.icio.us del.icio.us LinkedIn LinkedIn


All items in the PolyU Institutional Repository are protected by copyright, with all rights reserved, unless otherwise indicated.
No item in the PolyU IR may be reproduced for commercial or resale purposes.

 

© Pao Yue-kong Library, The Hong Kong Polytechnic University, Hung Hom, Kowloon, Hong Kong
Powered by DSpace (Version 1.5.2)  © MIT and HP
Feedback | Privacy Policy Statement | Copyright & Restrictions - Feedback