|
PolyU Institutional Repository >
Browsing by Subject "Batching"
Showing results 1 to 7 of 7
| Issue Date | Title | Author(s) | | Jan-2004 | Batching in a two-stage flowshop with dedicated machines in the second stage | Cheng, T. C. Edwin; Kovalyov, Mikhail Y.; Chakhlevich, K. N. |
| 16-Sep-2008 | Batch scheduling of deteriorating reworkables | Barketau, M. S.; Cheng, T. C. Edwin; Kovalyov, Mikhail Y. |
| Feb-2008 | Batch scheduling of step deteriorating jobs | Barketau, M. S.; Cheng, T. C. Edwin; Ng, Chi-to Daniel; Kotov, Vladimir; Kovalyov, Mikhail Y. |
| Jan-2008 | The bounded single-machine parallel-batching scheduling problem with family jobs and release dates to minimize makespan | Nong, Q. Q.; Ng, Chi-to Daniel; Cheng, T. C. Edwin |
| Sep-2003 | The single machine batching problem with family setup times to minimize maximum lateness is strongly NP-hard | Cheng, T. C. Edwin; Ng, Chi-to Daniel; Yuan, J. J. |
| 2006 | Single machine batch scheduling problem with family setup times and release dates to minimize makespan | Yuan, J. J.; Liu, Zhaohui; Ng, Chi-to Daniel; Cheng, T. C. Edwin |
| 14-Jun-2004 | The unbounded single machine parallel batch scheduling problem with family jobs and release dates to minimize makespan | Yuan, J. J.; Liu, Zhaohui; Ng, Chi-to Daniel; Cheng, T. C. Edwin |
Showing results 1 to 7 of 7
|