PolyU IR
 

PolyU Institutional Repository >

Browsing by Subject "Target cost contracts"

Jump to: 0-9 A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
or enter first few letters:   
Sort by: In order: Results/Page Authors/Record:
Showing results 1 to 5 of 5
Issue DateTitleAuthor(s)
Nov-2012 Developing a performance measurement index (PMI) for target cost contracts in construction: a Delphi studyChan, Daniel W. M.; Chan, Joseph H. L.
Jul-2010 Exploring the key risks and risk mitigation measures for guaranteed maximum price and target cost contracts in constructionChan, Daniel W. M.; Chan, Albert P. C.; Lam, Tsun-ip Patrick; Chan, H. L.
Sep-2011 Key risk factors and risk mitigation measures for target cost contracts in construction - a comparison between the West and the EastChan, H. L.; Chan, Daniel W. M.; Lord, Wayne
Oct-2011 Preferred risk allocation in target cost contracts in constructionChan, Joseph H. L.; Chan, Daniel W. M.; Lam, Tsun-ip Patrick; Chan, Albert P. C.
Aug-2011 Risk ranking and analysis in target cost contracts: empirical evidence from the construction industryChan, Daniel W. M.; Chan, Albert P. C.; Lam, Tsun-ip Patrick; Yeung, Fai-yip; Chan, Joseph H. L.
Showing results 1 to 5 of 5

 

© Pao Yue-kong Library, The Hong Kong Polytechnic University, Hung Hom, Kowloon, Hong Kong
Powered by DSpace (Version 1.5.2)  © MIT and HP
Feedback | Privacy Policy Statement | Copyright & Restrictions - Feedback