PolyU IR
 

PolyU Institutional Repository >

Browsing by Subject "Target cost contracting"

Jump to: 0-9 A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
or enter first few letters:   
Sort by: In order: Results/Page Authors/Record:
Showing results 1 to 6 of 6
Issue DateTitleAuthor(s)
Apr-2010 Achieving better performance through target cost contracts - The tale of an underground railway station modification projectChan, Daniel W. M.; Lam, Tsun-ip Patrick; Chan, Albert P. C.; Wong, James M. W.
Apr-2012 A comparative study of the benefits of applying target cost contracts between South Australia and Hong KongChan, Daniel W. M.; Lam, Tsun-ip Patrick; Chan, Joseph H. L.; Ma, Tony; Perkin, Thomas
May-2010 Empirical study of the risks and difficulties in implementing guaranteed maximum price and target cost contracts in constructionChan, Daniel W. M.; Chan, Albert P. C.; Lam, Tsun-ip Patrick; Wong, James M. W.
Jul-2011 An empirical survey of the motives and benefits of adopting guaranteed maximum price and target cost contracts in constructionChan, Daniel W. M.; Chan, Albert P. C.; Lam, Tsun-ip Patrick; Wong, James M. W.
Dec-2007 Evaluating guaranteed maximum price and target cost contracting strategies in Hong Kong construction industryChan, Daniel W. M.; Chan, Albert P. C.; Lam, Tsun-ip Patrick; Lam, W. M. Edmond; Wong, James M. W.
Jul-2010 Identifying the critical success factors for target cost contracts in the construction industryChan, Daniel W. M.; Chan, Albert P. C.; Lam, Tsun-ip Patrick; Wong, James M. W.
Showing results 1 to 6 of 6

 

© Pao Yue-kong Library, The Hong Kong Polytechnic University, Hung Hom, Kowloon, Hong Kong
Powered by DSpace (Version 1.5.2)  © MIT and HP
Feedback | Privacy Policy Statement | Copyright & Restrictions - Feedback