|
|
PolyU Institutional Repository >
Browsing by Subject "Target cost contracting"
Showing results 1 to 6 of 6
| Issue Date | Title | Author(s) | | Apr-2010 | Achieving better performance through target cost contracts - The tale of an underground railway station modification project | Chan, Daniel W. M.; Lam, Tsun-ip Patrick; Chan, Albert P. C.; Wong, James M. W. |
| Apr-2012 | A comparative study of the benefits of applying target cost contracts between South Australia and Hong Kong | Chan, Daniel W. M.; Lam, Tsun-ip Patrick; Chan, Joseph H. L.; Ma, Tony; Perkin, Thomas |
| May-2010 | Empirical study of the risks and difficulties in implementing guaranteed maximum price and target cost contracts in construction | Chan, Daniel W. M.; Chan, Albert P. C.; Lam, Tsun-ip Patrick; Wong, James M. W. |
| Jul-2011 | An empirical survey of the motives and benefits of adopting guaranteed maximum price and target cost contracts in construction | Chan, Daniel W. M.; Chan, Albert P. C.; Lam, Tsun-ip Patrick; Wong, James M. W. |
| Dec-2007 | Evaluating guaranteed maximum price and target cost contracting strategies in Hong Kong construction industry | Chan, Daniel W. M.; Chan, Albert P. C.; Lam, Tsun-ip Patrick; Lam, W. M. Edmond; Wong, James M. W. |
| Jul-2010 | Identifying the critical success factors for target cost contracts in the construction industry | Chan, Daniel W. M.; Chan, Albert P. C.; Lam, Tsun-ip Patrick; Wong, James M. W. |
Showing results 1 to 6 of 6
|