|
|
PolyU Institutional Repository >
Browsing by Subject "Scheduling"
Showing results 1 to 51 of 51
| Issue Date | Title | Author(s) | | 30-Nov-2003 | [3/2]-approximation for two-machine no-wait flowshop scheduling with availability constraints | Cheng, T. C. Edwin; Liu, Zhaohui |
| Aug-2005 | 4D dynamic construction management and visualization software: 1. Development | Chau, Kwok-wing; Anson, M.; Zhang, J. P. |
| Aug-2005 | 4D dynamic construction management and visualization software: 2. site trial | Chau, Kwok-wing; Anson, M.; De Saram, D. D. |
| 2006 | Achieving bounded delay on message delivery in publish/subscribe systems | Wang, Jinling; Cao, Jiannong; Li, Jing; Wu, Jie |
| 2004 | An adaptive sliding mode controller for buck converter in continuous conduction mode | Tan, Siew-chong; Lai, Y. M.; Tse, C. K. Michael; Cheung, Martin Kin-ho |
| Jul-2003 | Approximability of two-machine no-wait flowshop scheduling with availability constraints | Cheng, T. C. Edwin; Liu, Zhaohui |
| 30-Nov-2005 | Approximation schemes for minimizing total (weighted) completion time with release dates on a batch machine | Liu, Zhaohui; Cheng, T. C. Edwin |
| Jan-2004 | Batching in a two-stage flowshop with dedicated machines in the second stage | Cheng, T. C. Edwin; Kovalyov, Mikhail Y.; Chakhlevich, K. N. |
| 16-Sep-2008 | Batch scheduling of deteriorating reworkables | Barketau, M. S.; Cheng, T. C. Edwin; Kovalyov, Mikhail Y. |
| Feb-2008 | Batch scheduling of step deteriorating jobs | Barketau, M. S.; Cheng, T. C. Edwin; Ng, Chi-to Daniel; Kotov, Vladimir; Kovalyov, Mikhail Y. |
| Jan-2009 | Bicriterion scheduling with equal processing times on a batch processing machine | Liu, L. L.; Ng, Chi-to Daniel; Cheng, T. C. Edwin |
| 2008 | A bio-inspired scheduling scheme for wireless sensor networks | Cheng, Chi-tsun; Tse, C. K. Michael; Lau, Francis Chung-ming |
| Oct-2009 | Bounded single-machine parallel-batch scheduling with release dates and rejection | Lu, Lingfa; Cheng, T. C. Edwin; Yuan, Jinjiang; Zhang, Liqi |
| Sep-2007 | Coordinated scheduling of customer orders with decentralized machine locations | Li, Chung-Lun; Ou, Jinwen |
| 2007 | Coordinated workload scheduling in hierarchical sensor networks for data fusion applications | Li, Xiaolin; Kang, Hui; Cao, Jiannong |
| Feb-2007 | Coordinating production and distribution of jobs with bundling operations | Li, Chung-Lun; Vairaktarakis, George |
| Nov-2008 | An efficient algorithm for minimizing earliness, tardiness, and due-date costs for equal-sized jobs | Li, Chung-Lun; Mosheiov, Gur; Yovel, Uri |
| 31-Oct-2008 | An FPTAS for parallel-machine scheduling under a grade of service provision to minimize makespan | Ji, Min; Cheng, T. C. Edwin |
| Feb-2009 | A hybrid algorithm for the single-machine total tardiness problem | Cheng, T. C. Edwin; Lazarev, A. A.; Gafarov, E. R. |
| 1-Jul-2005 | Machine scheduling with deliveries to multiple customer locations | Li, Chung-Lun; Vairaktarakis, George; Lee, Chung-Yee |
| 1-Sep-2005 | Minimizing non-decreasing separable objective functions for the unit-time open shop scheduling problem | Cheng, T. C. Edwin; Shakhlevich, Natalia V. |
| 11-Oct-2006 | Multi-agent scheduling on a single machine to minimize total weighted number of tardy jobs | Cheng, T. C. Edwin; Ng, Chi-to Daniel; Yuan, J. J. |
| Jul-2008 | Multi-agent scheduling on a single machine with max-form criteria | Cheng, T. C. Edwin; Ng, Chi-to Daniel; Yuan, J. J. |
| 16-Oct-2004 | A note on the single machine serial batching scheduling problem to minimize maximum lateness with identical processing times | Yuan, J. J.; Yang, A. F.; Cheng, T. C. Edwin |
| 16-Apr-2007 | NP-hardness of the single-variable-resource scheduling problem to minimize the total weighted completion time | Yuan, J. J.; Cheng, T. C. Edwin; Ng, Chi-to Daniel |
| Jan-2003 | On scheduling an unbounded batch machine | Liu, Zhaohui; Yuan, J. J.; Cheng, T. C. Edwin |
| May-2009 | Production scheduling with supply and delivery considerations to minimize the makespan | Wang, Xiuli; Cheng, T. C. Edwin |
| Apr-2005 | Scheduling a batch-processing machine subject to precedence constraints, release dates and identical processing times | Cheng, T. C. Edwin; Yuan, J. J.; Yang, A. F. |
| Oct-2006 | Scheduling linear deteriorating jobs with an availability constraint on a single machine | Ji, Min; He, Yong; Cheng, T. C. Edwin |
| 1-Feb-2010 | Scheduling parallel machines with inclusive processing set restrictions and job release times | Li, Chung-Lun; Wang, Xiuli |
| Apr-2007 | Scheduling problems with the effects of deterioration and learning | Wang, Ji-Bo; Cheng, T. C. Edwin |
| 16-Oct-2006 | Scheduling unit-length jobs with machine eligibility restrictions | Li, Chung-Lun |
| Dec-2008 | Scheduling with processing set restrictions: A survey | Leung, Joseph Y.-T.; Li, Chung-Lun |
| Jan-2006 | Scheduling with step-improving processing times | Cheng, T. C. Edwin; He, Yong; Hoogeveen, Han; Ji, Min; Woeginger, Gerhard J. |
| Dec-2008 | Scheduling with subcontracting options | Chen, Zhi-Long; Li, Chung-Lun |
| Aug-2007 | A simple linear time algorithm for scheduling with step-improving processing times | Ji, Min; He, Yong; Cheng, T. C. Edwin |
| Sep-2003 | The single machine batching problem with family setup times to minimize maximum lateness is strongly NP-hard | Cheng, T. C. Edwin; Ng, Chi-to Daniel; Yuan, J. J. |
| 2006 | Single machine batch scheduling problem with family setup times and release dates to minimize makespan | Yuan, J. J.; Liu, Zhaohui; Ng, Chi-to Daniel; Cheng, T. C. Edwin |
| 1-Dec-2008 | Single-machine scheduling of multi-operation jobs without missing operations to minimize the total completion time | Cheng, T. C. Edwin; Ng, Chi-to Daniel; Yuan, J. J. |
| Feb-2008 | Single-machine scheduling with a time-dependent learning effect | Wang, Ji-Bo; Ng, Chi-to Daniel; Cheng, T. C. Edwin; Liu, L. L. |
| Apr-2007 | Single-machine scheduling with deteriorating jobs and learning effects to minimize the makespan | Wang, Xiuli; Cheng, T. C. Edwin |
| Aug-2008 | Single-machine scheduling with deteriorating jobs under a series-parallel graph constraint | Wang, Ji-Bo; Ng, Chi-to Daniel; Cheng, T. C. Edwin |
| 2003 | Single machine scheduling with release dates and due dates | Tian, Zhongjun |
| May-2005 | Single machine scheduling with resource dependent release times and processing times | Wang, Xiuli; Cheng, T. C. Edwin |
| May-2008 | Some scheduling problems with deteriorating jobs and learning effects | Cheng, T. C. Edwin; Wu, Chin-chia; Lee, Wen-chiung |
| 1-Jun-2008 | Some scheduling problems with sum-of-processing-times-based and job-position-based learning effects | Cheng, T. C. Edwin; Wu, Chin-chia; Lee, Wen-chiung |
| 16-Jun-2008 | A survey of scheduling problems with setup times or costs | Allahverdi, Ali; Ng, Chi-to Daniel; Cheng, T. C. Edwin; Kovalyov, Mikhail Y. |
| 2008 | Topology aware task allocation and scheduling for real-time data fusion applications in networked embedded sensor systems | Zhao, Baokang; Wang, Meng; Shao, Zili; Cao, Jiannong; Chan, Keith C. C.; Su, Jinshu |
| 1-Mar-2009 | Two semi-online scheduling problems on two uniform machines | Ng, Chi-to Daniel; Tan, Zhiyi; He, Yong; Cheng, T. C. Edwin |
| 14-Jun-2004 | The unbounded single machine parallel batch scheduling problem with family jobs and release dates to minimize makespan | Yuan, J. J.; Liu, Zhaohui; Ng, Chi-to Daniel; Cheng, T. C. Edwin |
| Dec-2008 | Viewpoint on “A note on unrelated parallel machine scheduling with time-dependent processing times” | Li, Chung-Lun |
Showing results 1 to 51 of 51
|