PolyU IR
 

PolyU Institutional Repository >

Browsing by Author "Lam, Tsun-ip Patrick"

Jump to: 0-9 A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
or enter first few letters:   
Sort by: In order: Results/Page Authors/Record:
Showing results 2 to 16 of 16
< previous 
Issue DateTitleAuthor(s)
Oct-2012 A comparative study of critical success factors for public private partnerships (PPP) between Mainland China and the Hong Kong Special Administrative RegionCheung, Esther; Chan, Albert P. C.; Lam, Tsun-ip Patrick; Chan, Daniel W. M.; Ke, Yongjian
Apr-2012 A comparative study of the benefits of applying target cost contracts between South Australia and Hong KongChan, Daniel W. M.; Lam, Tsun-ip Patrick; Chan, Joseph H. L.; Ma, Tony; Perkin, Thomas
Feb-2011 Developing a fuzzy risk assessment model for guaranteed maximum price and target cost contracts in constructionChan, Joseph H. L.; Chan, Daniel W. M.; Chan, Albert P. C.; Lam, Tsun-ip Patrick; Yeung, Fai-yip
May-2010 Empirical study of the risks and difficulties in implementing guaranteed maximum price and target cost contracts in constructionChan, Daniel W. M.; Chan, Albert P. C.; Lam, Tsun-ip Patrick; Wong, James M. W.
Jul-2011 An empirical survey of the motives and benefits of adopting guaranteed maximum price and target cost contracts in constructionChan, Daniel W. M.; Chan, Albert P. C.; Lam, Tsun-ip Patrick; Wong, James M. W.
Dec-2007 Evaluating guaranteed maximum price and target cost contracting strategies in Hong Kong construction industryChan, Daniel W. M.; Chan, Albert P. C.; Lam, Tsun-ip Patrick; Lam, W. M. Edmond; Wong, James M. W.
Jul-2010 Exploring the key risks and risk mitigation measures for guaranteed maximum price and target cost contracts in constructionChan, Daniel W. M.; Chan, Albert P. C.; Lam, Tsun-ip Patrick; Chan, H. L.
Mar-2011 Guaranteed maximum price (GMP) contracts in practice: a case study of a private office development project in Hong KongChan, Daniel W. M.; Lam, Tsun-ip Patrick; Chan, Albert P. C.; Wong, James M. W.
Jul-2010 Identifying the critical success factors for target cost contracts in the construction industryChan, Daniel W. M.; Chan, Albert P. C.; Lam, Tsun-ip Patrick; Wong, James M. W.
Oct-2007 An investigation of guaranteed maximum price (GMP) and target cost contracting (TCC) procurement strategies in Hong Kong construction industryChan, Daniel W. M.; Chan, Albert P. C.; Lam, Tsun-ip Patrick; Lam, W. M. Edmond; Wong, James M. W.
Jul-2011 Output specifications for PPP projects: lessons from case studiesJaved, Arshad Ali; Lam, Tsun-ip Patrick; Chan, Albert P. C.
Oct-2011 Preferred risk allocation in target cost contracts in constructionChan, Joseph H. L.; Chan, Daniel W. M.; Lam, Tsun-ip Patrick; Chan, Albert P. C.
Nov-2013 Probabilistic risk assessment of the energy saving shortfall in energy performance contracting projects–a case studyLee, Pan; Lam, Tsun-ip Patrick; Yik, Francis W. H.; Chan, Edwin H. W.
Feb-2012 Risk mitigation strategies for guaranteed maximum price and target cost contracts in construction: a factor analysis approachChan, Joseph H. L.; Chan, Daniel W. M.; Chan, Albert P. C.; Lam, Tsun-ip Patrick
Aug-2011 Risk ranking and analysis in target cost contracts: empirical evidence from the construction industryChan, Daniel W. M.; Chan, Albert P. C.; Lam, Tsun-ip Patrick; Yeung, Fai-yip; Chan, Joseph H. L.
Showing results 2 to 16 of 16
< previous 

 

© Pao Yue-kong Library, The Hong Kong Polytechnic University, Hung Hom, Kowloon, Hong Kong
Powered by DSpace (Version 1.5.2)  © MIT and HP
Feedback | Privacy Policy Statement | Copyright & Restrictions - Feedback