|
|
PolyU Institutional Repository >
Browsing by Author "Cheng, T. C. Edwin"
Showing results 76 to 104 of 104
| Issue Date | Title | Author(s) | | Apr-2005 | Scheduling a batch-processing machine subject to precedence constraints, release dates and identical processing times | Cheng, T. C. Edwin; Yuan, J. J.; Yang, A. F. |
| Apr-2007 | Scheduling in an assembly-type production chain with batch transfer | Lin, B. M. T.; Cheng, T. C. Edwin; Chou, A. S. C. |
| Oct-2006 | Scheduling linear deteriorating jobs with an availability constraint on a single machine | Ji, Min; He, Yong; Cheng, T. C. Edwin |
| Apr-2007 | Scheduling problems with the effects of deterioration and learning | Wang, Ji-Bo; Cheng, T. C. Edwin |
| Jan-2003 | Scheduling start time dependent tasks with deadlines and identical initial processing times on a single machine | Cheng, T. C. Edwin; Ding, Q. |
| Jan-2006 | Scheduling with step-improving processing times | Cheng, T. C. Edwin; He, Yong; Hoogeveen, Han; Ji, Min; Woeginger, Gerhard J. |
| Jun-2005 | Semi-on-line multiprocessor scheduling with given total processing time | Cheng, T. C. Edwin; Kellerer, Hans; Kotov, Vladimir |
| Aug-2007 | A simple linear time algorithm for scheduling with step-improving processing times | Ji, Min; He, Yong; Cheng, T. C. Edwin |
| Sep-2003 | The single machine batching problem with family setup times to minimize maximum lateness is strongly NP-hard | Cheng, T. C. Edwin; Ng, Chi-to Daniel; Yuan, J. J. |
| 2006 | Single machine batch scheduling problem with family setup times and release dates to minimize makespan | Yuan, J. J.; Liu, Zhaohui; Ng, Chi-to Daniel; Cheng, T. C. Edwin |
| May-2005 | Single machine due-date scheduling of jobs with decreasing start-time dependent processing times | Cheng, T. C. Edwin; Kang, Liying; Ng, Chi-to Daniel |
| 1-Dec-2008 | Single-machine scheduling of multi-operation jobs without missing operations to minimize the total completion time | Cheng, T. C. Edwin; Ng, Chi-to Daniel; Yuan, J. J. |
| Feb-2008 | Single-machine scheduling with a time-dependent learning effect | Wang, Ji-Bo; Ng, Chi-to Daniel; Cheng, T. C. Edwin; Liu, L. L. |
| Apr-2007 | Single-machine scheduling with deteriorating jobs and learning effects to minimize the makespan | Wang, Xiuli; Cheng, T. C. Edwin |
| Aug-2008 | Single-machine scheduling with deteriorating jobs under a series-parallel graph constraint | Wang, Ji-Bo; Ng, Chi-to Daniel; Cheng, T. C. Edwin |
| Jun-2007 | Single-machine scheduling with periodic maintenance to minimize makespan | Ji, Min; He, Yong; Cheng, T. C. Edwin |
| May-2005 | Single machine scheduling with resource dependent release times and processing times | Wang, Xiuli; Cheng, T. C. Edwin |
| Oct-2007 | Single-machine scheduling with trade-off between number of tardy jobs and compression cost | He, Yong; Wei, Qi; Cheng, T. C. Edwin |
| May-2008 | Some scheduling problems with deteriorating jobs and learning effects | Cheng, T. C. Edwin; Wu, Chin-chia; Lee, Wen-chiung |
| 1-Jun-2008 | Some scheduling problems with sum-of-processing-times-based and job-position-based learning effects | Cheng, T. C. Edwin; Wu, Chin-chia; Lee, Wen-chiung |
| Jan-2002 | The state of quality management implementation: A cross-sectional study of quality-oriented companies in Hong Kong | Lai, Kee-hung Mike; Weerakoon, Thilaka S.; Cheng, T. C. Edwin |
| Sep-2003 | Supply chain performance in transport logistics: An assessment by service providers | Lai, Kee-hung Mike; Cheng, T. C. Edwin |
| 16-Jun-2008 | A survey of scheduling problems with setup times or costs | Allahverdi, Ali; Ng, Chi-to Daniel; Cheng, T. C. Edwin; Kovalyov, Mikhail Y. |
| 2005 | Two-machine flowshop batching and scheduling | Lin, B. M. T.; Cheng, T. C. Edwin |
| Mar-2006 | Two-machine flowshop scheduling with conditional deteriorating second operations | Lin, B. M. T.; Cheng, T. C. Edwin |
| Nov-2005 | Two-machine flowshop scheduling with job class setups to minimize total flowtime | Wang, Xiuli; Cheng, T. C. Edwin |
| Jun-2007 | Two-machine open shop problem with controllable processing times | Cheng, T. C. Edwin; Shakhlevich, Natalia V. |
| 1-Mar-2009 | Two semi-online scheduling problems on two uniform machines | Ng, Chi-to Daniel; Tan, Zhiyi; He, Yong; Cheng, T. C. Edwin |
| 14-Jun-2004 | The unbounded single machine parallel batch scheduling problem with family jobs and release dates to minimize makespan | Yuan, J. J.; Liu, Zhaohui; Ng, Chi-to Daniel; Cheng, T. C. Edwin |
Showing results 76 to 104 of 104
|