PolyU IR
 

PolyU Institutional Repository >

Browsing by Author "Cheng, T. C. Edwin"

Jump to: 0-9 A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
or enter first few letters:   
Sort by: In order: Results/Page Authors/Record:
Showing results 24 to 103 of 109
< previous   next >
Issue DateTitleAuthor(s)
Dec-2007 Developing an e-logistics system : A case studyGunasekaran, A.; Ngai, W. T. Eric; Cheng, T. C. Edwin
Sep-2007 Development of an RFID-based traceability system: experiences and lessons learned from an aircraft engineering companyNgai, W. T. Eric; Cheng, T. C. Edwin; Lai, Kee-hung Mike; Chai, P. Y. F.; Choi, Y. S.; Sin, R. K. Y.
11-Feb-2003 Development of a web-based system for supporting sales in a mineral water manufacturing firm: A case studyNgai, W. T. Eric; Cheng, T. C. Edwin; Lee, C. M. Y.
Oct-2008 The driving forces of customer loyalty: A study of Internet service providers in Hong KongCheng, T. C. Edwin; Lai, L. C. F.; Yeung, Andy C. L.
2007 Due-date assignment and parallel-machine scheduling with deteriorating jobsCheng, T. C. Edwin; Kang, Liying; Ng, Chi-to Daniel
2004 Due-date assignment and single machine scheduling with deteriorating jobsCheng, T. C. Edwin; Kang, Liying; Ng, Chi-to Daniel
Nov-2012 Effects of national culture on human failures in container shipping : the moderating role of confucian dynamismLu, Chin-Shan; Lai, Kee-hung Mike; Lun, Venus; Cheng, T. C. Edwin
2005 An empirical model for managing quality in the electronics industryYeung, Andy C. L.; Cheng, T. C. Edwin; Lai, Kee-hung Mike
Sep-2004 An empirical taxonomy for logistics service providersLai, Kee-hung Mike; Cheng, T. C. Edwin; Yeung, Andy C. L.
Mar-2008 Extending the understanding of end user information systems satisfaction formation: An equitable needs fulfillment model approachAu, Norman; Ngai, W. T. Eric; Cheng, T. C. Edwin
6-Apr-2009 Extreme values of the sum of squares of degrees of bipartite graphsCheng, T. C. Edwin; Guo, Yonglin; Zhang, Shenggui; Du, Yongjun
31-Oct-2008 An FPTAS for parallel-machine scheduling under a grade of service provision to minimize makespanJi, Min; Cheng, T. C. Edwin
30-Apr-2007 An FPTAS for scheduling with piecewise linear decreasing processing times to minimize makespanJi, Min; Cheng, T. C. Edwin
Feb-2004 From customer orientation to customer satisfaction: the gap between theory and practiceYeung, Andy C. L.; Cheng, T. C. Edwin; Chan, Ling-yau
Aug-2008 Group sequencing around a common due dateCheng, T. C. Edwin; Kovalyov, Mikhail Y.; Ng, Chi-to Daniel; Lam, S. S.
6-Apr-2008 Hamilton-connectivity of 3-domination critical graphs with α=δ+1≥5Chen, Yaojun; Cheng, T. C. Edwin; Ng, Chi-to Daniel
28-Oct-2008 Heavy cycles in k-connected weighted graphs with large weighted degree sumsChen, Bing; Zhang, Shenggui; Cheng, T. C. Edwin
Aug-2006 Henig efficiency of a multi-criterion supply-demand network equilibrium modelCheng, T. C. Edwin; Wu, Yunan
May-2006 A heuristic approach for tow-machine no-wait flowshop scheduling with due dates and class setupsWang, Xiuli; Cheng, T. C. Edwin
Jan-2007 Heuristics for two-machine flowshop scheduling with setup times and an availability constraintWang, Xiuli; Cheng, T. C. Edwin
Feb-2009 A hybrid algorithm for the single-machine total tardiness problemCheng, T. C. Edwin; Lazarev, A. A.; Gafarov, E. R.
Sep-2008 The impact of employee satisfaction on quality and profitability in high-contact service industriesYee, Rachel W. Y.; Yeung, Andy C. L.; Cheng, T. C. Edwin
Sep-2008 The impact of information sharing in a multiple-echelon supply chainWu, Y. N.; Cheng, T. C. Edwin
Feb-2005 The impact of information sharing in a two-level supply chain with multiple retailersCheng, T. C. Edwin; Wu, Y. N.
Mar-2007 The impact of specific supplier development efforts on buyer competitive advantage: an empirical modelLi, Wenli; Humphrey, Paul K.; Yeung, Andy C. L.; Cheng, T. C. Edwin
Aug-2007 An improved algorithm for the p-center problem on interval graphs with unit lengthsCheng, T. C. Edwin; Kang, Liying; Ng, Chi-to Daniel
2011 An improved FPTAS for mobile agent routing with time constraintsLevner, Eugene; Elalouf, Amir; Cheng, T. C. Edwin
Sep-2008 An improved on-line algorithm for scheduling on two unrestrictive parallel batch processing machinesNong, Q. Q.; Cheng, T. C. Edwin; Ng, Chi-to Daniel
Apr-2003 Initiatives and outcomes of quality management implementation across industriesLai, Kee-hung Mike; Cheng, T. C. Edwin
Jan-2006 Institutional isomorphism and the adoption of information technology for supply chain managementLai, Kee-hung Mike; Wong, Christina W. Y.; Cheng, T. C. Edwin
1-Feb-2009 Johnson's rule, composite jobs and the relocation problemCheng, T. C. Edwin; Lin, B. M. T.
Jun-2009 Mean-variance analysis of the newsvendor model with stockout costWu, Jun; Li, Jian; Wang, Shouyang; Cheng, T. C. Edwin
Nov-2002 Measures for evaluating supply chain performance in transport logisticsLai, Kee-hung Mike; Ngai, W. T. Eric; Cheng, T. C. Edwin
Sep-2007 Measuring success factors of quality management in the shipping industryCheng, T. C. Edwin; Choy, Petrus W. C.
1-Sep-2005 Minimizing non-decreasing separable objective functions for the unit-time open shop scheduling problemCheng, T. C. Edwin; Shakhlevich, Natalia V.
16-Jun-2008 Minimizing sum of completion times for batch scheduling of jobs with deteriorating processing timesLeung, Joseph Y.-T.; Ng, Chi-to Daniel; Cheng, T. C. Edwin
Jul-2004 Minimizing total completion time subject to job release dates and preemption penaltiesLiu, Zhaohui; Cheng, T. C. Edwin
Feb-2007 Mobile commerce integrated with RFID technology in a container depotNgai, W. T. Eric; Cheng, T. C. Edwin; Au, S.; Lai, Kee-hung Mike
11-Oct-2006 Multi-agent scheduling on a single machine to minimize total weighted number of tardy jobsCheng, T. C. Edwin; Ng, Chi-to Daniel; Yuan, J. J.
Jul-2008 Multi-agent scheduling on a single machine with max-form criteriaCheng, T. C. Edwin; Ng, Chi-to Daniel; Yuan, J. J.
16-Aug-2006 A new algorithm for online uniform-machine scheduling to minimize the makespanCheng, T. C. Edwin; Ng, Chi-to Daniel; Kotov, Vladimir
15-Apr-2006 A note on acyclic domination number in graphs of diameter twoCheng, T. C. Edwin; Chen, Yaojun; Ng, Chi-to Daniel
Sep-2005 A note on domination and minus domination numbers in cubic graphsChen, Yaojun; Cheng, T. C. Edwin; Ng, Chi-to Daniel; Shan, Erfang
16-Oct-2004 A note on the single machine serial batching scheduling problem to minimize maximum lateness with identical processing timesYuan, J. J.; Yang, A. F.; Cheng, T. C. Edwin
16-Apr-2007 NP-hardness of the single-variable-resource scheduling problem to minimize the total weighted completion timeYuan, J. J.; Cheng, T. C. Edwin; Ng, Chi-to Daniel
Jan-2003 On scheduling an unbounded batch machineLiu, Zhaohui; Yuan, J. J.; Cheng, T. C. Edwin
Jun-2004 Paired-domination in inflated graphsKang, Liying; Sohn, Moo Young; Cheng, T. C. Edwin
1-Oct-2007 Paired domination on interval and circular-arc graphsCheng, T. C. Edwin; Kang, Liying; Ng, Chi-to Daniel
Jan-2004 Parallel machine scheduling to minimize the sum of quadratic completion timesCheng, T. C. Edwin; Liu, Zhaohui
16-Jul-2008 Parallel-machine scheduling with simple linear deterioration to minimize total completion timeJi, Min; Cheng, T. C. Edwin
28-Jan-2009 A polynomial-time algorithm for the paired-domination problem on permutation graphsCheng, T. C. Edwin; Kang, Liying; Shan, Erfang
May-2009 Production scheduling with supply and delivery considerations to minimize the makespanWang, Xiuli; Cheng, T. C. Edwin
6-May-2007 The Ramsey numbers for a cycle of length six or seven versus a clique of order sevenCheng, T. C. Edwin; Chen, Yaojun; Zhang, Yunqing; Ng, Chi-to Daniel
Jul-2008 The Ramsey numbers R(C[sub m], K[sub 7]) and R(C[sub 7], K[sub 8])Chen, Yaojun; Cheng, T. C. Edwin; Zhang, Yunqing
Jun-2005 Relationship stability and supplier commitment to qualityLai, Kee-hung Mike; Cheng, T. C. Edwin; Yeung, Andy C. L.
6-Aug-2008 Remarks on minus (signed) total domination in graphsShan, Erfang; Cheng, T. C. Edwin
Apr-2005 Scheduling a batch-processing machine subject to precedence constraints, release dates and identical processing timesCheng, T. C. Edwin; Yuan, J. J.; Yang, A. F.
Apr-2007 Scheduling in an assembly-type production chain with batch transferLin, B. M. T.; Cheng, T. C. Edwin; Chou, A. S. C.
Oct-2006 Scheduling linear deteriorating jobs with an availability constraint on a single machineJi, Min; He, Yong; Cheng, T. C. Edwin
Apr-2007 Scheduling problems with the effects of deterioration and learningWang, Ji-Bo; Cheng, T. C. Edwin
Jan-2003 Scheduling start time dependent tasks with deadlines and identical initial processing times on a single machineCheng, T. C. Edwin; Ding, Q.
Jan-2006 Scheduling with step-improving processing timesCheng, T. C. Edwin; He, Yong; Hoogeveen, Han; Ji, Min; Woeginger, Gerhard J.
Jun-2005 Semi-on-line multiprocessor scheduling with given total processing timeCheng, T. C. Edwin; Kellerer, Hans; Kotov, Vladimir
Aug-2007 A simple linear time algorithm for scheduling with step-improving processing timesJi, Min; He, Yong; Cheng, T. C. Edwin
Sep-2003 The single machine batching problem with family setup times to minimize maximum lateness is strongly NP-hardCheng, T. C. Edwin; Ng, Chi-to Daniel; Yuan, J. J.
2006 Single machine batch scheduling problem with family setup times and release dates to minimize makespanYuan, J. J.; Liu, Zhaohui; Ng, Chi-to Daniel; Cheng, T. C. Edwin
May-2005 Single machine due-date scheduling of jobs with decreasing start-time dependent processing timesCheng, T. C. Edwin; Kang, Liying; Ng, Chi-to Daniel
1-Dec-2008 Single-machine scheduling of multi-operation jobs without missing operations to minimize the total completion timeCheng, T. C. Edwin; Ng, Chi-to Daniel; Yuan, J. J.
May-1997 Single machine scheduling to minimize batch delivery and job earliness penaltiesCheng, T. C. Edwin; Kovalyov, Mikhail Y.; Lin, Bertrand M.-T.
Feb-2008 Single-machine scheduling with a time-dependent learning effectWang, Ji-Bo; Ng, Chi-to Daniel; Cheng, T. C. Edwin; Liu, L. L.
Apr-2007 Single-machine scheduling with deteriorating jobs and learning effects to minimize the makespanWang, Xiuli; Cheng, T. C. Edwin
Aug-2008 Single-machine scheduling with deteriorating jobs under a series-parallel graph constraintWang, Ji-Bo; Ng, Chi-to Daniel; Cheng, T. C. Edwin
Jun-2007 Single-machine scheduling with periodic maintenance to minimize makespanJi, Min; He, Yong; Cheng, T. C. Edwin
May-2005 Single machine scheduling with resource dependent release times and processing timesWang, Xiuli; Cheng, T. C. Edwin
Oct-2007 Single-machine scheduling with trade-off between number of tardy jobs and compression costHe, Yong; Wei, Qi; Cheng, T. C. Edwin
May-2008 Some scheduling problems with deteriorating jobs and learning effectsCheng, T. C. Edwin; Wu, Chin-chia; Lee, Wen-chiung
1-Jun-2008 Some scheduling problems with sum-of-processing-times-based and job-position-based learning effectsCheng, T. C. Edwin; Wu, Chin-chia; Lee, Wen-chiung
Jan-2002 The state of quality management implementation: A cross-sectional study of quality-oriented companies in Hong KongLai, Kee-hung Mike; Weerakoon, Thilaka S.; Cheng, T. C. Edwin
Sep-2003 Supply chain performance in transport logistics: An assessment by service providersLai, Kee-hung Mike; Cheng, T. C. Edwin
16-Jun-2008 A survey of scheduling problems with setup times or costsAllahverdi, Ali; Ng, Chi-to Daniel; Cheng, T. C. Edwin; Kovalyov, Mikhail Y.
Showing results 24 to 103 of 109
< previous   next >

 

© Pao Yue-kong Library, The Hong Kong Polytechnic University, Hung Hom, Kowloon, Hong Kong
Powered by DSpace (Version 1.5.2)  © MIT and HP
Feedback | Privacy Policy Statement | Copyright & Restrictions - Feedback