PolyU IR
 

PolyU Institutional Repository >

Browsing by Author "Cheng, T. C. Edwin"

Jump to: 0-9 A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
or enter first few letters:   
Sort by: In order: Results/Page Authors/Record:
Showing results 2 to 81 of 109
< previous   next >
Issue DateTitleAuthor(s)
Dec-2006 Adoption of internet banking : an empirical study in Hong KongCheng, T. C. Edwin; Lam, David Y. C.; Yeung, Andy C. L.
Oct-2008 Analysis of postponement strategy by EPQ-based models with planned backordersLi, Jian; Wang, Shouyang; Cheng, T. C. Edwin
May-2007 Analysis of postponement strategy for perishable items by EOQ-based modelsLi, Jian; Cheng, T. C. Edwin; Wang, Shouyang
1-May-2009 An analytical study of the modification ability of distribution centersZhao, Qiuhong; Cheng, T. C. Edwin
28-Jul-2008 An application of the Turán theorem to domination in graphsShan, Erfang; Cheng, T. C. Edwin; Kang, Liying
Jul-2003 Approximability of two-machine no-wait flowshop scheduling with availability constraintsCheng, T. C. Edwin; Liu, Zhaohui
Oct-2007 An approximation scheme for two-machine flowshop scheduling with setup times and an availability constraintWang, Xiuli; Cheng, T. C. Edwin
30-Nov-2005 Approximation schemes for minimizing total (weighted) completion time with release dates on a batch machineLiu, Zhaohui; Cheng, T. C. Edwin
16-Jan-2007 Batch delivery scheduling with batch delivery cost on a single machineJi, Min; He, Yong; Cheng, T. C. Edwin
Jan-2004 Batching in a two-stage flowshop with dedicated machines in the second stageCheng, T. C. Edwin; Kovalyov, Mikhail Y.; Chakhlevich, K. N.
16-Sep-2008 Batch scheduling of deteriorating reworkablesBarketau, M. S.; Cheng, T. C. Edwin; Kovalyov, Mikhail Y.
Feb-2008 Batch scheduling of step deteriorating jobsBarketau, M. S.; Cheng, T. C. Edwin; Ng, Chi-to Daniel; Kotov, Vladimir; Kovalyov, Mikhail Y.
Jan-2009 Bicriterion scheduling with equal processing times on a batch processing machineLiu, L. L.; Ng, Chi-to Daniel; Cheng, T. C. Edwin
May-1998 Bicriterion single machine scheduling with resource dependent processing timesCheng, T. C. Edwin; Janiak, Adam; Kovalyov, Mikhail Y.
Jan-2008 The bounded single-machine parallel-batching scheduling problem with family jobs and release dates to minimize makespanNong, Q. Q.; Ng, Chi-to Daniel; Cheng, T. C. Edwin
Oct-2009 Bounded single-machine parallel-batch scheduling with release dates and rejectionLu, Lingfa; Cheng, T. C. Edwin; Yuan, Jinjiang; Zhang, Liqi
28-Mar-2009 Codiameters of 3-domination critical graphs with toughness more than oneCheng, T. C. Edwin; Chen, Yaojun; Ng, Chi-to Daniel
Nov-2012 Configuring quality management and marketing implementation and the performance implications for industrial marketersLai, Kee-hung Mike; Yeung, Andy C. L.; Cheng, T. C. Edwin
Jan-2008 A coordination-theoretic investigation of the impact of electronic integration on logistics performanceLai, Kee-hung Mike; Wong, Christina W. Y.; Cheng, T. C. Edwin
Sep-2004 Critical success factors of web-based supply-chain management systems : An exploratory studyNgai, W. T. Eric; Cheng, T. C. Edwin; Ho, S. S. M.
2008 Customer heterogeneity in operational e-service design attributes: An empirical investigation of service qualitySousa, Rui; Yeung, Andy C. L.; Cheng, T. C. Edwin
Oct-2007 Customer order scheduling to minimize total weighted completion timeWang, Guoqing; Cheng, T. C. Edwin
Dec-2007 Developing an e-logistics system : A case studyGunasekaran, A.; Ngai, W. T. Eric; Cheng, T. C. Edwin
Sep-2007 Development of an RFID-based traceability system: experiences and lessons learned from an aircraft engineering companyNgai, W. T. Eric; Cheng, T. C. Edwin; Lai, Kee-hung Mike; Chai, P. Y. F.; Choi, Y. S.; Sin, R. K. Y.
11-Feb-2003 Development of a web-based system for supporting sales in a mineral water manufacturing firm: A case studyNgai, W. T. Eric; Cheng, T. C. Edwin; Lee, C. M. Y.
Oct-2008 The driving forces of customer loyalty: A study of Internet service providers in Hong KongCheng, T. C. Edwin; Lai, L. C. F.; Yeung, Andy C. L.
2007 Due-date assignment and parallel-machine scheduling with deteriorating jobsCheng, T. C. Edwin; Kang, Liying; Ng, Chi-to Daniel
2004 Due-date assignment and single machine scheduling with deteriorating jobsCheng, T. C. Edwin; Kang, Liying; Ng, Chi-to Daniel
Nov-2012 Effects of national culture on human failures in container shipping : the moderating role of confucian dynamismLu, Chin-Shan; Lai, Kee-hung Mike; Lun, Venus; Cheng, T. C. Edwin
2005 An empirical model for managing quality in the electronics industryYeung, Andy C. L.; Cheng, T. C. Edwin; Lai, Kee-hung Mike
Sep-2004 An empirical taxonomy for logistics service providersLai, Kee-hung Mike; Cheng, T. C. Edwin; Yeung, Andy C. L.
Mar-2008 Extending the understanding of end user information systems satisfaction formation: An equitable needs fulfillment model approachAu, Norman; Ngai, W. T. Eric; Cheng, T. C. Edwin
6-Apr-2009 Extreme values of the sum of squares of degrees of bipartite graphsCheng, T. C. Edwin; Guo, Yonglin; Zhang, Shenggui; Du, Yongjun
31-Oct-2008 An FPTAS for parallel-machine scheduling under a grade of service provision to minimize makespanJi, Min; Cheng, T. C. Edwin
30-Apr-2007 An FPTAS for scheduling with piecewise linear decreasing processing times to minimize makespanJi, Min; Cheng, T. C. Edwin
Feb-2004 From customer orientation to customer satisfaction: the gap between theory and practiceYeung, Andy C. L.; Cheng, T. C. Edwin; Chan, Ling-yau
Aug-2008 Group sequencing around a common due dateCheng, T. C. Edwin; Kovalyov, Mikhail Y.; Ng, Chi-to Daniel; Lam, S. S.
6-Apr-2008 Hamilton-connectivity of 3-domination critical graphs with α=δ+1≥5Chen, Yaojun; Cheng, T. C. Edwin; Ng, Chi-to Daniel
28-Oct-2008 Heavy cycles in k-connected weighted graphs with large weighted degree sumsChen, Bing; Zhang, Shenggui; Cheng, T. C. Edwin
Aug-2006 Henig efficiency of a multi-criterion supply-demand network equilibrium modelCheng, T. C. Edwin; Wu, Yunan
May-2006 A heuristic approach for tow-machine no-wait flowshop scheduling with due dates and class setupsWang, Xiuli; Cheng, T. C. Edwin
Jan-2007 Heuristics for two-machine flowshop scheduling with setup times and an availability constraintWang, Xiuli; Cheng, T. C. Edwin
Feb-2009 A hybrid algorithm for the single-machine total tardiness problemCheng, T. C. Edwin; Lazarev, A. A.; Gafarov, E. R.
Sep-2008 The impact of employee satisfaction on quality and profitability in high-contact service industriesYee, Rachel W. Y.; Yeung, Andy C. L.; Cheng, T. C. Edwin
Sep-2008 The impact of information sharing in a multiple-echelon supply chainWu, Y. N.; Cheng, T. C. Edwin
Feb-2005 The impact of information sharing in a two-level supply chain with multiple retailersCheng, T. C. Edwin; Wu, Y. N.
Mar-2007 The impact of specific supplier development efforts on buyer competitive advantage: an empirical modelLi, Wenli; Humphrey, Paul K.; Yeung, Andy C. L.; Cheng, T. C. Edwin
Aug-2007 An improved algorithm for the p-center problem on interval graphs with unit lengthsCheng, T. C. Edwin; Kang, Liying; Ng, Chi-to Daniel
2011 An improved FPTAS for mobile agent routing with time constraintsLevner, Eugene; Elalouf, Amir; Cheng, T. C. Edwin
Sep-2008 An improved on-line algorithm for scheduling on two unrestrictive parallel batch processing machinesNong, Q. Q.; Cheng, T. C. Edwin; Ng, Chi-to Daniel
Apr-2003 Initiatives and outcomes of quality management implementation across industriesLai, Kee-hung Mike; Cheng, T. C. Edwin
Jan-2006 Institutional isomorphism and the adoption of information technology for supply chain managementLai, Kee-hung Mike; Wong, Christina W. Y.; Cheng, T. C. Edwin
1-Feb-2009 Johnson's rule, composite jobs and the relocation problemCheng, T. C. Edwin; Lin, B. M. T.
Jun-2009 Mean-variance analysis of the newsvendor model with stockout costWu, Jun; Li, Jian; Wang, Shouyang; Cheng, T. C. Edwin
Nov-2002 Measures for evaluating supply chain performance in transport logisticsLai, Kee-hung Mike; Ngai, W. T. Eric; Cheng, T. C. Edwin
Sep-2007 Measuring success factors of quality management in the shipping industryCheng, T. C. Edwin; Choy, Petrus W. C.
1-Sep-2005 Minimizing non-decreasing separable objective functions for the unit-time open shop scheduling problemCheng, T. C. Edwin; Shakhlevich, Natalia V.
16-Jun-2008 Minimizing sum of completion times for batch scheduling of jobs with deteriorating processing timesLeung, Joseph Y.-T.; Ng, Chi-to Daniel; Cheng, T. C. Edwin
Jul-2004 Minimizing total completion time subject to job release dates and preemption penaltiesLiu, Zhaohui; Cheng, T. C. Edwin
Feb-2007 Mobile commerce integrated with RFID technology in a container depotNgai, W. T. Eric; Cheng, T. C. Edwin; Au, S.; Lai, Kee-hung Mike
11-Oct-2006 Multi-agent scheduling on a single machine to minimize total weighted number of tardy jobsCheng, T. C. Edwin; Ng, Chi-to Daniel; Yuan, J. J.
Jul-2008 Multi-agent scheduling on a single machine with max-form criteriaCheng, T. C. Edwin; Ng, Chi-to Daniel; Yuan, J. J.
16-Aug-2006 A new algorithm for online uniform-machine scheduling to minimize the makespanCheng, T. C. Edwin; Ng, Chi-to Daniel; Kotov, Vladimir
15-Apr-2006 A note on acyclic domination number in graphs of diameter twoCheng, T. C. Edwin; Chen, Yaojun; Ng, Chi-to Daniel
Sep-2005 A note on domination and minus domination numbers in cubic graphsChen, Yaojun; Cheng, T. C. Edwin; Ng, Chi-to Daniel; Shan, Erfang
16-Oct-2004 A note on the single machine serial batching scheduling problem to minimize maximum lateness with identical processing timesYuan, J. J.; Yang, A. F.; Cheng, T. C. Edwin
16-Apr-2007 NP-hardness of the single-variable-resource scheduling problem to minimize the total weighted completion timeYuan, J. J.; Cheng, T. C. Edwin; Ng, Chi-to Daniel
Jan-2003 On scheduling an unbounded batch machineLiu, Zhaohui; Yuan, J. J.; Cheng, T. C. Edwin
Jun-2004 Paired-domination in inflated graphsKang, Liying; Sohn, Moo Young; Cheng, T. C. Edwin
1-Oct-2007 Paired domination on interval and circular-arc graphsCheng, T. C. Edwin; Kang, Liying; Ng, Chi-to Daniel
Jan-2004 Parallel machine scheduling to minimize the sum of quadratic completion timesCheng, T. C. Edwin; Liu, Zhaohui
16-Jul-2008 Parallel-machine scheduling with simple linear deterioration to minimize total completion timeJi, Min; Cheng, T. C. Edwin
28-Jan-2009 A polynomial-time algorithm for the paired-domination problem on permutation graphsCheng, T. C. Edwin; Kang, Liying; Shan, Erfang
May-2009 Production scheduling with supply and delivery considerations to minimize the makespanWang, Xiuli; Cheng, T. C. Edwin
6-May-2007 The Ramsey numbers for a cycle of length six or seven versus a clique of order sevenCheng, T. C. Edwin; Chen, Yaojun; Zhang, Yunqing; Ng, Chi-to Daniel
Jul-2008 The Ramsey numbers R(C[sub m], K[sub 7]) and R(C[sub 7], K[sub 8])Chen, Yaojun; Cheng, T. C. Edwin; Zhang, Yunqing
Jun-2005 Relationship stability and supplier commitment to qualityLai, Kee-hung Mike; Cheng, T. C. Edwin; Yeung, Andy C. L.
6-Aug-2008 Remarks on minus (signed) total domination in graphsShan, Erfang; Cheng, T. C. Edwin
Apr-2005 Scheduling a batch-processing machine subject to precedence constraints, release dates and identical processing timesCheng, T. C. Edwin; Yuan, J. J.; Yang, A. F.
Apr-2007 Scheduling in an assembly-type production chain with batch transferLin, B. M. T.; Cheng, T. C. Edwin; Chou, A. S. C.
Showing results 2 to 81 of 109
< previous   next >

 

© Pao Yue-kong Library, The Hong Kong Polytechnic University, Hung Hom, Kowloon, Hong Kong
Powered by DSpace (Version 1.5.2)  © MIT and HP
Feedback | Privacy Policy Statement | Copyright & Restrictions - Feedback