Browsing by Author Cheng, T. C. Edwin

Jump to: 0-9 A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
or enter first few letters:  
Showing results 97 to 109 of 109 < previous 
Issue DateTitleAuthor(s)
Jun-2007Single-machine scheduling with periodic maintenance to minimize makespanJi, Min; He, Yong; Cheng, T. C. Edwin
Oct-2007Single-machine scheduling with trade-off between number of tardy jobs and compression costHe, Yong; Wei, Qi; Cheng, T. C. Edwin
May-2008Some scheduling problems with deteriorating jobs and learning effectsCheng, T. C. Edwin; Wu, Chin-chia; Lee, Wen-chiung
1-Jun-2008Some scheduling problems with sum-of-processing-times-based and job-position-based learning effectsCheng, T. C. Edwin; Wu, Chin-chia; Lee, Wen-chiung
Jan-2002The state of quality management implementation : a cross-sectional study of quality-oriented companies in Hong KongLai, Kee-hung Mike; Weerakoon, Thilaka S.; Cheng, T. C. Edwin
Sep-2003Supply chain performance in transport logistics: An assessment by service providersLai, Kee-hung Mike; Cheng, T. C. Edwin
16-Jun-2008A survey of scheduling problems with setup times or costsAllahverdi, Ali; Ng, Chi-to Daniel; Cheng, T. C. Edwin; Kovalyov, Mikhail Y.
1-Mar-2009Two semi-online scheduling problems on two uniform machinesNg, Chi-to Daniel; Tan, Zhiyi; He, Yong; Cheng, T. C. Edwin
2005Two-machine flowshop batching and schedulingLin, B. M. T.; Cheng, T. C. Edwin
Mar-2006Two-machine flowshop scheduling with conditional deteriorating second operationsLin, B. M. T.; Cheng, T. C. Edwin
Nov-2005Two-machine flowshop scheduling with job class setups to minimize total flowtimeWang, Xiuli; Cheng, T. C. Edwin
Jun-2007Two-machine open shop problem with controllable processing timesCheng, T. C. Edwin; Shakhlevich, Natalia V.
14-Jun-2004The unbounded single machine parallel batch scheduling problem with family jobs and release dates to minimize makespanYuan, J. J.; Liu, Zhaohui; Ng, Chi-to Daniel; Cheng, T. C. Edwin